-
Jaw crusherJaw Crusher: Jaw crusher can be used to crush material, whose compression strength is not more than 320M
-
Impact crusherImpact Crusher is optimized after adopting advanced techniques,and the capability of impact crusher got advanced very mu
-
Spring cone crusherSpring Cone crusher is widely applied in metallurgical, construction, road building, chemical and phosphatic industry. C
-
Circular vibrating sCircular vibrating screen is is specially designed to sieve different sizes of aggregate.There are YK and YA serie
-
Sand making productisand-making&washing production line include jaw crusher, sand making machine,vibrating screen (circular vibrating sc
The eight pionts when operate the ball mill
News summaryNews information
ZhengZhou HengXing Heavy Equipment Co.,Ltd is the manufacturer of ball mill,energy-saving ball mill,grate-type ball mill,wet ball mill,etc. Any machine need to use it correctly and maintain it well. The ball mill will run well when you use it correctly, we give the followin eight points for your consideration:
1. Ball mill girth gear dust-proof cover must be closed tight, to avoid the dust and impurities invasion.
2. If find the girth gear and the main bearing has invaded slurry sand, should stop the ball mill immediately,and don not delay.
3.The ball mill big watts happen the tile burning accident or close to the tile burning, Shall promptly adopt compulsory cooling measures, don't stop immediately, in case accident caused by holding shaft
4. To strictly in accordance with the provisions of the ball to the task of mine water added, banned overload or no load operation, pay attention to prevent the occurrence of inflation belly or hollow phenomenon, lest broken liners
5. Fixed ball mill liner screw should add hemp circles seal to prevent leakage leak slurry phenomenon
6. In order to facilitate replacement, the gap between lining board 20mm 10 - and, when necessary, available oxygen welding cutting
7. Ball mill, shall not exceed two consecutive start, second should be more than five minutes after first start. third start must be approved by an electrician, fitter coordinate with the inspection ,thencan start
8.When there are several sets in one workshop, two set of synchronous motor are not allowed to start at the same time.
For the ball mill main specifications,please find http://www.superballmill.com/beneficiation-equipment/ball-mill-419.html
Tel: 0086-371-67858720 Fax: 0086-371-67858720 Contact: Mr Zhang
Copyright @ 2011 Zhengzhou Hengxing Heavy Equipment
